01What changes in Brisbane
Queensland Government guidance says a network connection application must be lodged with and approved by the distributor before solar is installed. For South East Queensland, the distributor is Energex, and a compatible digital meter is required to measure exported electricity. That provides a concrete Brisbane content angle: explain the steps and set expectations rather than selling a package as if installation starts immediately.
Coverage should also reflect the installer’s operation across Brisbane, Logan, Redlands, Moreton Bay or Ipswich. Those areas should not be bundled automatically when travel, quoting and crew allocation differ.
